| |
|
|
|
|

the last day open |

packing up the circ desk
|

cutting up the circ desk |

moving the books out |
|

packing up the office |

arriving at temporary home |

installing circ desk |

books and disassembled shelves |
|

putting books back on shelves |

an empty looking library |

library with rubble instead of walls |

removing old doors and windows |
|

filling in existing window openings |

steel and concrete |

no ceiling left |

no more entrance |
|

exterior stud walls going up |

inside conduits |

walls going up |

view from 2nd Street |
|

the perimeter taking shape |

finishing up the concrete slab
|

more holes in the roof
|

new building meets old |
|

roof trusses |

brickwork on the front side |

standing in the new part |

more brick and stone work
|
|

technical services office
|

roof trusses in new part of building |

trenching for new electrical service |

notice new window frames |
|

starting the roof at last!! |

building to building |

the library has a front entrance again! |

bathroom tile |
|

new interior spaces |

the new entrance |

new meeting room |

next step drop ceiling |
|

floor to ceiling (and then some) windows |

after a construction meeting walk through |

the view looking towards Walnut St. |
|